🏆 New Constructing: The most important new constructing utility filed final week was for a 3.2 million-square-foot skyscraper at 175 Park Avenue within the East Midtown-Turtle Bay part of Manhattan. The builders are RXR Realty and TF Cornerstone. Vram Malek with Skidmore, Owings and Merrill is the architect.
Job Submitting Quantity: M01347992-I1
📊 New Constructing: In Manhattan’s Chelsea-Hudson Yards neighborhood, the Hudson Boulevard Collective filed plans to assemble two towers throughout 1.7 million sq. ft at 548 and 550 West thirty sixth Road. The buildings will home 1,758 residential items. Daniel Kaplan is the architect.
Job Submitting Numbers: M01360100-I1, M01360104-I1
🏆 Alteration: Manhattan had the highest alteration utility filed final week at 250 West Road within the Tribeca-Civic Heart space. West Property Belief plans to undertake 314,117 sq. ft of alteration work on the 11-story property, which homes 111 items. The architect is Joseph Vance. Job Submitting Quantity: M01345783-I1
📊 Alteration: In Fort Greene, YS Builders LLC filed an utility for 214,590 sq. ft of alteration work at 14 Ryerson Road and 17,268 sq. ft of labor at 313 Park Avenue. The buildings stand eight tales tall and home 95 items mixed. Hamish Whitefield is the challenge’s architect.
Job Submitting Numbers: B01376971-I1, B01378457-I1
📊 Alteration: Within the Bronx neighborhood of Concourse, architect James Braddock filed plans on behalf of the proprietor to change 191,701 sq. ft of house at 558 Grand Concourse. The property stands 4 tales tall.
Job Submitting Quantity: X01373793-I1
🏆 Demolition: In Fort Greene, a one-story construction at 57 Corridor Road is being demolished. The constructing is owned by YS Builders LLC and the challenge’s engineer is Duy Hoang. The property spans 555,920 sq. ft.
Job Submitting Quantity: B01374614-I1
📊 Demolition: Within the Bronx, engineer Santiago Helman filed plans to knock down an 18,000-square-foot, one-story construction at 1740 East Tremont Avenue.
Job Submitting Quantity: X01326805-I1
Supply Notes:
Permits filed between 3/23/26 and three/27/26
Preliminary permits NB, Main Alterations, Demolitions
